
A typical industrial shed requires: Heavy Columns (Jindal), Roof Purlins (Secondary), Foundation Bolts (Fasteners), and Chequered Plates (SAIL). Buying these from 4 vendors is a logistics nightmare.
The Hidden Cost of Multi-Vendor Sourcing
Multiple Vendors
- • 4 different POs to process
- • 4 trucks (paying for 'part-load' air)
- • Uncoordinated arrival times
- • Blame game on quality issues
J.M. Shah Aggregation
- • Single Purchase Order
- • Mixed-Load Trucks: Beams + Plates in one go
- • Full truck utilization (Lower freight/kg)
- • Single point of accountability
We act as your Project Procurement Partner. Even if an item is not in our immediate stock, we source it, inspect it, and load it onto the same truck as your primary steel, ensuring your site gets a "Complete Kit" for erection.
